Gathering lines, transmission pipe, and midstream infrastructure across the Gulf Coast run under pressure, and CIPP was never built for that job. Hill Services is the only certified Primus installer for industrial oil and gas in the United States, a Kevlar-family pressure pipe liner that rehabilitates lines carrying natural gas, water, and petroleum products without digging them up.
|
Oil & Gas & Energy Pipeline Systems
Trenchless Pipeline Rehabilitation for Oil & Gas and Energy InfrastructureMidstream and energy infrastructure runs almost entirely on pressure: gathering lines, transmission pipe, terminal piping, and fire main systems that stay pressurized around the clock. CIPP was built for gravity flow and was never rated for pressure service, which makes pressure-rated pipe lining the primary rehabilitation method in this sector rather than a fallback option. Roughly fifteen other Primus installers operate in the United States, and every one of them works the municipal water market. Hill Services is the only contractor certified to install Primus pressure pipe lining for industrial oil and gas. That is a contract status, not a marketing claim, and it means the pool of qualified options for a pressure pipeline rehabilitation in this sector is effectively one company. Primus folds flat for insertion into an existing line, then unfolds and cures under pressure, rated for gas, water, and petroleum product service. It replaces the disruption and cost of excavating a working pipeline with a process measured in days.
|
Most of the infrastructure in this sector runs under pressure. We also cover the gravity and coating work that supports it. Full technical detail on each method is further down the page.
Primus Pressure Pipe LiningThe core rehabilitation method for natural gas, water, and petroleum product pipelines under pressure. Hill Services holds the only industrial oil and gas certification in the U.S. |
CIPP Trenchless LiningFor gravity-fed collection and drainage systems supporting gathering and terminal facilities. |
Plural Hot-Heated Epoxy CoatingCorrosion protection for storage tanks, pump stations, and structures exposed to product and moisture. |
Video Inspection and AssessmentLine condition assessment before rehabilitation, so the method matches what the pipe actually needs. |
These are the systems where pressure pipe rehabilitation matters most and excavation is rarely practical.
Gathering & Transmission LinesPressure pipe rehabilitation for lines moving product from the field to processing and storage, where an excavation-based repair can take a line out of service for months. |
Midstream TerminalsPipe and structure rehabilitation at terminal and transfer facilities along the corridor, where multiple pipeline systems converge and downtime affects more than one operator. |
|
Natural Gas PipelinesPrimus pressure lining rated for gas service, installed without disrupting supply to the facilities and customers downstream of the line. |
Fire Main SystemsPressure pipe rehabilitation for life-safety systems that cannot stay out of service long, inspected and returned to service on a compressed timeline. |
|
Pump Station InfrastructureCoating and lining for the pipe and structures that keep product moving, addressing corrosion before it becomes a containment issue. |
Pipeline Right-of-Way CrossingsTrenchless rehabilitation where excavation across a right-of-way is impractical or restricted, using two access pits instead of a continuous trench. |
|
Hill Services works oil and gas and energy infrastructure throughout the greater Houston industrial corridor.




If this is enough to know Hill Services understands oil and gas and energy infrastructure, the next step is a conversation. Contact an expert or request a project estimate below. Prefer more detail first? The technical breakdown of CIPP, Primus, and epoxy, along with the standards and equipment behind each one, continues below.
What follows covers the three trenchless methods Hill Services installs on oil and gas and energy infrastructure, in more depth than most visitors need. Every project starts with a video inspection to document the line’s actual condition: gravity or pressure, corrosion pattern, material already lost. That inspection is what determines which method below is the right one. Keep scrolling for the technical detail, or reach out now if you already have what you need.
Cured-in-place pipe rehabilitates gravity-fed lines supporting gathering and terminal facilities, drainage and collection systems that were never under pressure to begin with. A resin-saturated liner is inserted into the existing pipe using air inversion, then cured in place with heat applied through burners, forming a new structural pipe inside the old one without excavating across a right-of-way.
The Masterliner CIPP products used on Hill Services projects meet ASTM F1216 and F1743, the governing standards for cured-in-place pipe design and installation. Ed Ward, our lead technician, is Masterliner-certified across the full four-inch to ninety-six-inch diameter range and has personally installed more than 500,000 linear feet.
CIPP is not manufactured for pressure service. In midstream and energy infrastructure, where most lines run under pressure, that limits CIPP to the smaller share of the system that runs gravity flow. It is the wrong method for a transmission or gathering line and the right one for the drainage system next to it.
4″–96″ Diameter range installed |
500,000+ ft Installed by our lead technician |
ASTM F1216 / F1743 Governing standards met |
Primus is a flexible pressure pipe system built around a fabric of aramid fibers, the same fiber family as Kevlar, layered between an inner and outer wall of polyethylene or thermoplastic polyurethane. That fabric layer lets the liner carry the full operating pressure on its own once installed, rather than depending on adhesion to the host pipe. Manufacturer testing rates the system for a minimum fifty-year service life.
Installation needs only two access pits, one at each end of the section being rehabilitated, not a continuous trench across a pipeline right-of-way. The old pipe is inspected by camera and mechanically cleaned, then the liner, delivered folded flat, is winched through using a pulling head rated to more than 22,000 pounds of force. Once in place, it is pressurized with air to round out into its final shape, connectors are pressed on at each end, and the section is pressure tested before it goes back into service.
Individual sections can run up to 8,200 feet in a single continuous pull, which cuts down the number of connection points on a long pipeline run, a meaningful advantage on gathering and transmission lines that can run for miles. Primus is certified for drinking water and gas service, rated for operating pressure above 1,000 PSI depending on pipe size. Hill Services is the only contractor certified to install it for industrial oil and gas applications in the United States. Our longest single pull to date is 4,600 feet, in Texas.
8,200 ft Max. single continuous pull |
50-year Rated minimum service life |
1,000+ PSI Rated operating pressure |
Plural hot-heated epoxy is a 100 percent solids coating system, spray-applied from a heated trailer that can reach up to 300 feet of hose run. It applies directly to concrete without sandblasting, and it can go on wet surfaces, which matters at a terminal or pump station where taking a structure fully out of service is rarely simple.
The formulation is matched to the exposure rather than sold as one universal product. Current systems handle a pH range of roughly 2 to 13, and Hill Services’ applications have tested to a 2,500 psi pull test, holding up against the moisture and product exposure common at storage and transfer facilities.
Spray-applied epoxy accounts for an estimated 15 to 25 percent of manhole and structure rehabilitation work nationally by volume, and that share climbs toward half of all specifications in severe corrosion environments, exactly the condition storage tanks and pump stations produce over time.
Ed Ward, who leads this work at Hill Services, calls it the Cadillac of the industry. It costs more to install than a cementitious coating. It also holds up longer in the conditions midstream infrastructure actually produces.
pH 2–13 Chemical resistance range |
2,500 psi Pull test rating |
300 ft Spray reach from trailer |
Hill Services also provides plumbing, HVACR, and industrial and environmental services for facilities like this one.
Talk to a NACE-certified inspector or a Primus-certified specialist about your line before you commit to a formal estimate. We will tell you straight whether pressure lining is the right fit for the job.