A marine terminal had to have its product line back in service before the next vessel arrived. How 2,200 feet of 10-inch line was lined in seven working days.
A Houston Ship Channel plant shut down a leaking six-inch discharge line and trucked treated wastewater daily until roughly 16,000 feet of it was lined in place, without a trench.
A water line patched more than once ran beneath cooling towers, buildings, and a road at a chemical plant. Hill Services rehabilitated it from two small access points in about...